Arrow

Property Description
The 100% NexGen owned Rook I Project – host of the Arrow Deposit – is the largest development-stage uranium project in the world. With a robust economic profile, the Project is advancing through elite ESG commitments focused on environmental stewardship and maximizing community benefit through a partnership approach.
Due to the Arrow Deposit’s unique geological profile, the Project is designed as an underground mining operation, with conventional long hole stoping methods.
Geological Characteristics
- Situated along the fertile Patterson Corridor
- Hosted exclusively within crystalline basement rocks through a series of subvertical shears (A1 – A5)
- 337.4 M lb U₃O₈ – measured, indicated, and inferred resource
- Deposit remains open at depth – potential for future resource expansion
Feasibility Study (FS)
- On February 17, 2021, NexGen released its independent Feasibility Study (FS) of the Rook I Project. The FS was completed in accordance with NI 43-101 standards and includes joint work by leading consultants including Stantec Consulting Limited, Wood Canada Ltd., and Roscoe Postle Associated Inc.
Summary of Completed Geophysical Surveys
Current Exploration