Arrow

Property Description

The 100% NexGen owned Rook I Project – host of the Arrow Deposit – is the largest development-stage uranium project in the world. With a robust economic profile, the Project is advancing through elite ESG commitments focused on environmental stewardship and maximizing community benefit through a partnership approach.

Due to the Arrow Deposit’s unique geological profile, the Project is designed as an underground mining operation, with conventional long hole stoping methods.

Geological Characteristics

  • Situated along the fertile Patterson Corridor
  • Hosted exclusively within crystalline basement rocks through a series of subvertical shears (A1 – A5)
  • 337.4 M lb U₃O₈ – measured, indicated, and inferred resource
  • Deposit remains open at depth – potential for future resource expansion

Feasibility Study (FS)

  • On February 17, 2021, NexGen released its independent Feasibility Study (FS) of the Rook I Project. The FS was completed in accordance with NI 43-101 standards and includes joint work by leading consultants including Stantec Consulting Limited, Wood Canada Ltd., and Roscoe Postle Associated Inc.

2021 Feasibility Study

Rook I Project

Summary of Completed Geophysical Surveys

Current Exploration

Other

Discovery Date

February 2014

Stage

Established Resource

Project Description

Rook I Project – Construction, Permitting and Licensing

Location

Southwest Athabasca Basin, Saskatchewan. Canada

Commodity

Acquired

Prospective Corridors

Total Metres Drilled